BLOGGER TEMPLATES AND TWITTER BACKGROUNDS

Friday, 16 December 2011

Opening Sequence Development Chart

Wednesday, 14 December 2011

Current Grade Post

My last current grade was:
My target grade is: D1
My current grade is: D1
To improve to my next grade I need to:

Monday, 5 December 2011

Opening Sequence Draft 4 (Assignment 18)



ASSESMENT OF ASSIGNMENT __18_: Opening Sequence Draft 4
Self Assessment:        
In this assignment, I think WWW was….
- all of the task set each slides are all finished
- researches are all developed with pictures and annotations
- the scripts are in the correct structure
- the interview results are easier to read
- there is a small british film distribution

In this assignment, it would have been EBI I….
-
-
-

Record of Grade:        
In this assignment I would have graded myself with a grade _D/C_ because we are done on all of the work set and developed the things we are missing. I received a grade ___.
Targets to improve:    
To improve on this assignment I need to….

Teacher Assessment: 
If applicable then this is to include a copy of the teacher assessment (JPEG image) as a post.
If not, write N/A.
Peer Assessment: 
If applicable then this is to include a copy of the teacher assessment (JPEG image) as a post.
If not, write N/A.
Any additional drafts: 
N/A